• Skip to main content
Alfandre Architecture, Hudson Valley - logo

Healthy Buildings, Healthy People, Healthy Communities, and a Healthful Planet

845.255.4774

  • home
  • services
    • commercial architecture
    • residential architecture
    • design & build services
    • green building
    • sustainable design
    • master planning & visioning
  • projects
    • case studies
    • commercial
    • Hospitality
    • professional & office
    • spiritual & religious buildings
    • cultural, civic & historic
    • government, municipal & education
    • residential
    • retail
    • multifamily
    • agribusiness
  • about
    • who we are
    • case studies
  • News
    • Press
    • Blog
  • Jobs
  • contact

New Paltz Municipal Building: Police Station and Courthouse – Project Summary

by Alfandre Architecture

New Paltz Municipal Building exterior
New Paltz Police Department Sally Port

New Paltz Municipal Building: Police Station and Courthouse — Project Summary

With a focus on air quality and energy efficiency, Alfandre Architecture designed a new 2-story municipal facility within an existing pre-engineered metal building at 59 N. Putt Corners Road in New Paltz. The 16,800 SF New Paltz Municipal Building houses the Town of New Paltz Police Station, Courthouse, Court Offices and provides public meeting space.

The facility achieves its ultra-low energy use through the thoughtful coordination of multiple building systems, including increased insulation and air tightness, energy efficient utilities and state-of-the-art HVAC systems.

Increasing the overall insulation and airtightness of the former 8,400 sf warehouse building was a priority to guarantee overall energy efficiency. Insulation values that meet or exceed NYSERDA requirements were achieved through improved air-sealing, installing new windows and doors and adding insulation to the walls and roof.

Water use is decreased by the installation of low-flow fixtures throughout the building. Low-flow fixtures are designed to save water and energy over conventional fixtures by using fewer gallons of water per minute.

Rick Alfandre Reviewing Building Plans
Rick Alfandre reviews plan details.
Court building interior framing
Court building interior framing.

Electrical use is reduced by the installation of LED lighting fixtures throughout the facility. LED lights consume 80-90% less energy than incandescent bulbs, emit less heat, produce more light, have a longer life, and are more durable. Additionally, occupancy sensors have been installed on each light switch to reduce the amount of energy that is used.

New Paltz Municipal Building: Courthouse and Court Offices

Custom-built court chamber and benches
Custom-built court chamber and benches.
Courthouse interview rooms
Courthouse interview rooms.

Using two separate fans and duct systems, the Energy Recovery Ventilator (ERV) draws fresh, clean air into the building and removes stale indoor air. A heat exchanger pre-heats (or pre-cools – dependent on the season) the incoming fresh air by transferring the energy between the air streams. In addition to retaining the temperature of the indoor environment, the ERV captures contaminants, pollutants, allergens and pollen; providing energy-efficient, healthy indoor air.

A Variable Air Volume(VAV) system is used throughout the building as well, modulating the temperature for each room. This system enables energy-efficient HVAC system distribution by optimizing the amount and temperature of distributed air. Occupancy sensors for HVAC functions have been installed so that heating and cooling occur when needed. Unlike other air distribution systems, VAV systems use flow control to efficiently condition each building zone.

New Paltz Municipal Building: Town of New Paltz Police Station

Police dispatch lobby
Police dispatch lobby.
Police Chief and Lieutenant's offices
Police Chief and Lieutenant's offices.
Stairwell and elevator for ADA access
Stairwell and elevator for ADA access.
Police training and meeting room
Police training and meeting room.

The new New Paltz Municipal Building is truly an upgrade for the Town of New Paltz; it will be a place they will be happy to call home for years to come. We are proud of our role in this project and grateful to have been selected as the architecture firm on this project.

Schematics presented prior to construction
Schematics presented prior to construction.
Floor rendering schematic
Floor rendering schematic.

If you like this post, please share ...

Share
Tweet
Pin
0 Shares

Need help with your project?

SCHEDULE A CALL
MAIN PORTFOLIO

Related Projects

RVCSD Greenhouse, Accord, NY Project

Image of green house.
New Construction / Site Analysis

Rondout Municipal Center Project

Rondout Municipal Center
Adaptive Re-Use / Renovation

Hudson Valley Farm Hub, Hurley, NY – Project Summary

Farm Hub
Renovation / Site Analysis
Share
Tweet
Pin
0 Shares

DESIGN

PLAN

BUILD

231 Main Street Suite 201     New Paltz, NY 12561     Phone: 845.255.4774

Diversity flag

HOME | SERVICES | PORTFOLIO | ABOUT | NEWS | BLOG | CONTACT | TERMS OF SERVICE | PRIVACY POLICY | COOKIE POLICY | PRIVACY SETTINGS

Copyright © 2026 Alfandre Architecture PC | Site

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Name*
Potential project address*
Is the Mailing Address, different than the physical site location?
Mailing address
How did you find us?*

The send button will be hidden until you answer this.
Before you submit this form please be advised that we do send out 1-2 important automated emails to you immediately after this form is submitted. To ensure that the email gets to you, please add info@alfandre.com to your contacts and make sure to check your spam folder.*
We are NOT putting you on an email list.